Page 84 - Petrosphere - Loss Control Management (LCM) Training Manual V 1.0
P. 84

83  Module 10: System Safety for the High-Potential Accident                                    Loss Control Management (LCM)


                   •   The Element or Component Parts Within a System will include:

                          •   manpower


                          •   materials

                          •   machinery

                          •   methods


                   •   Each system will have a series of phases which follow a chronological pattern; the sum total of
                       which will equate to the overall life span of the system.

               Phases of the System

                   1.  CONCEPTUAL PHASE
                          •   It considers the basic principles of the system and formulates the preliminary designs and
                              method of operation.


                          •   It is at this stage that hazard and operability studies should be undertaken

                   2.  DESIGN and ENGINEERING PHASE
                          •   Develops the basic idea from the conceptual phase, and augments them to enable

                              translation into practical equipment and procedures

                          •   This phase should include testing and analysis of the various components to ensure
                              compliance with various system specifications.

                          •   It is at this stage that job safety analysis should be undertaken.


                   3.  OPERATIONAL PHASE
                          •   Involves the bringing together of the various components, i.e., manpower, materials,
                              machinery, methods; in order to achieve the purpose of the system.


                          •   From a practical viewpoint, it is at this stage that safe systems of work should be
                              developed and communicated.

                   4.  DISPOSAL PHASE
                          •   Begins when machinery and manpower are no longer needed to achieve the purpose of

                              the system.

                          •   All components must be effectively disposed of transferred, re-allocated or placed into
                              storage.