83 Module 10: System Safety for the High-Potential Accident Loss Control Management (LCM)
• The Element or Component Parts Within a System will include:
• manpower
• materials
• machinery
• methods
• Each system will have a series of phases which follow a chronological pattern; the sum total of
which will equate to the overall life span of the system.
Phases of the System
1. CONCEPTUAL PHASE
• It considers the basic principles of the system and formulates the preliminary designs and
method of operation.
• It is at this stage that hazard and operability studies should be undertaken
2. DESIGN and ENGINEERING PHASE
• Develops the basic idea from the conceptual phase, and augments them to enable
translation into practical equipment and procedures
• This phase should include testing and analysis of the various components to ensure
compliance with various system specifications.
• It is at this stage that job safety analysis should be undertaken.
3. OPERATIONAL PHASE
• Involves the bringing together of the various components, i.e., manpower, materials,
machinery, methods; in order to achieve the purpose of the system.
• From a practical viewpoint, it is at this stage that safe systems of work should be
developed and communicated.
4. DISPOSAL PHASE
• Begins when machinery and manpower are no longer needed to achieve the purpose of
the system.
• All components must be effectively disposed of transferred, re-allocated or placed into
storage.