Page 100 - Petrosphere - Loss Control Management (LCM) Training Manual V 1.0
P. 100

99  Module 12: Product Safety Management                                                  Loss Control Management (LCM)


                   •   use of PSM program coordinator and committee
                   •   use of a PSM program auditor

               Role of the Safety and Health Professional

                       In a small medium size company, he may be selected to be a PSM
               program coordinator or auditor. However, as company product line
               increases, management may designate the head of the engineering
               department for this assignment, appointing the SHP as an
               assistant.
                       The Safety and Health Professional evaluates the person’s

               performance to determine if he or she is, in fact, adequately
               contributing to the PSM program. In addition, members of the safety
               and health department can provide safety surveillance in production areas to help prevent accidents.


               Who are involved in PSM Program?
               Answer: Virtually ALL DEPARTMENT
               But following play more significant roles.
                   •   Primary Engineering

                   •   Manufacturing Service
                   •   Legal
                   •   Marketing
                   •   Purchasing
                   •   Human Resources
                   •   Insurance
                   •   Public Relations


               Role of the Engineering or Design Department
                   •   Evaluate product hazards prior to production.
                   •   Formally assigned evaluator in this evaluator.

                   •   Had a formal written or prepared design review procedure.
               INSTRUCTION MANUALS

                   1.  ACCOMPANYING THE PRODUCT – should respect hazard warning and show how the hazards
                       can be reduced or avoided.

                   2.  IN ADITION – the manual should instruct consumers on how to inspect the product upon receipt
                       and how to assemble, install and inspect it periodically.





                                                    PETROSPHERE INC.
                                       www.petrosphere.com.ph | info@petrosphere.com.ph
   95   96   97   98   99   100   101   102   103   104   105